Industrial computer solution
The scheme of automatic debugging for electrical energy for industrial computer
Time: 2015-06-11
visit: 300
The rapid development of power system needs to improve, advanced and practical power network dispatching automation system to guarantee. At present, the country tune and network, province level 3 dispatching system have been equipped with the power grid dispatching automation system, and before a system to achieve the national network. A new generation of power grid dispatching automation system should take into account the influence of Internet / Intranet technology to electric power enterprises should be to SCADA functions as the foundation, DA/DMS, am / FM / GIS, MIS and other subsystems for extensions, with network integration platform, multi-function system in the design, development.
The hardware of the system: the latest and high reliability of microcomputer hardware technology, as a system workstation, server hardware platform.
System software: dispatching automation system of the operating system by a new generation of Microsoft Windows NT / 2000; database using high performance commercial relational database, such as MS SQL server, Oracle, Sybase, system software configuration standards and specifications; output of the system in the form of using Microsoft Office Excel and other excellent software tools, the report system more convenient and easy to use; software architecture using distributed network client / server mode.
System principle
Using the hub form a network structure, network rate of 100MB / s, configuration of dual FEP / data server, double dispatching staff for station, management information workstation, intelligent multi serial port, double cut switch, modem cabinet, satellite clock and later according to the specific circumstances of any increase in work station.
Uplink information: RTU information from first by modem modulator demodulator, sending people to double switch, by double switch also to two intelligent multi serial port to send, by two intelligent multi serial respectively to the two front machine / server to transmit data, after the main front-end / data service server processing, storage, to broadcast online, the workstation received information after the corresponding treatment.
Downlink information: from workstation information sent first to the main front engine / data server, by the sent to the intelligent multi serial port, then transmitted to the double switch, the modulation and demodulation cabinet and sent to the RTU.
Information sent to the MIS network: front machine / data server with the MIS network hardware interface, and through the interface to send a variety of real-time and historical data to the MIS network.
System block diagram
System configuration
Dispatcher station: 4U /PIII CPU /PIII 1G/256M/70G/ CD-ROM chassis card / Floppy / card
Front machine: 6U chassis CPU /PIII card (dual card) 1G/256M/300G/ /PIII each function card
Report: /PIII CPU workstation 4U chassis /PIII 800/128M/70G card CD-ROM / Floppy / functional card
Maintenance workstation: 4U chassis /PIII CPU card /PIII 800/128M/70G CD-ROM / Floppy / functional card
Main server: HP+ disk array
WEB server: 3U chassis CPU /PIII card 800/128M/70G /PIII
System evaluation
This system can be widely used in district level and county dispatching system.. System uses the IPC especially core part such as front, as the hardware platform of the system greatly enhances the product stability in operation and control for the high price also makes the system with stronger market competition ability
